Advanced Handling

  • Aftersales

Health & Safety Resources

Thorough examinations: LOLER and PuWER

LOLER inspections for lifting equipment

Maintenance of lifting equipment is critical to the safety and performance of the unit. Advanced Handling manufactures primarily non passenger/ people lifting equipment which has different legislation to passenger lifting equipment. All our units are CE marked and are delivered with a Declaration of Conformity.

For insurance certification Thorough Examinations are required which include LOLER inspections (Lifting Operations and Lifting Equipment Regulations 1998) and PuWER inspections (Provision of and Use of Work Equipment Regulations 1998.)

Advanced Handling has a team of service engineers qualified to conduct Thorough Examinations for all lifting equipment including other leading manufacturers of scissor lifts, goods lifts, Pronomic lift and drive trolleys and stackers.

For more information about LOLER testing please see the links below or contact our Customer Service team on 01778 345365.

 

Useful information and links:

For general Health & Safety information visit HSE

To answer your questions about LOLER visit HSE

For information about PUWER visit HSE 

What is a thorough examination? Read more here from the HSE Guidelines.

Thorough examination of Lifting Equipment: A simple employers guide